Iowa ABC Connections - Working Standards and Design Examples

Project status

Completed

Start date: 04/01/13
End date: 06/30/15

Researcher(s)

Principal investigators:

About the research

With the construction of a bridge (known as the Massena Bridge) using accelerated bridge construction (ABC) practices, an opportunity existed to capture important documentation and other information using video and other mediums.

Publications

Report: Iowa ABC Connections (2.27 mb pdf) June 2015

Tech transfer summary: Iowa ABC Connections (622.45 kb pdf) Jun 2015

Sponsor(s)/partner(s)

Sponsor(s):

  • Federal Highway Administration State Planning and Research Funding
  • Iowa Department of Transportation