Instrumentation and Monitoring of Precast, Post-tensioned Bridge Approach Pavement

Project status

Completed

Start date: 07/01/05
End date: 06/30/08

Researcher(s)

Principal investigators:

Co-principal investigators:

About the research

The purpose of this proposal is to instrument, monitor and evaluate the performance of a precast, post-tensioned concrete bridge approach pavement (PPAP). This project is an important step in the rapid construction as well as the overall ride quality and structural durability of bridges and approach pavements in Iowa.

Publications

Report: Integral Bridge Abutment-to-Approach Slab Connections (9.75 mb pdf) June 2008

Tech transfer summary: Integral Bridge Abutment-to-Approach Slab Connections (434.83 kb pdf) Jun 2008

Sponsor(s)/partner(s)

Sponsor(s): Iowa Highway Research Board